LWLondon Wulfe
Portfolio · Project Experience

High-rise decks. Heavy flatwork. Real numbers.

Signature concrete work from the Miami high-rise market and estimating engagements across Western PA. Every project is real, every number is what we actually delivered.

Signature Concrete Experience

High-rise structural concrete in the Miami market.

Elevated deck placements of 500–1,200 CY with beam-and-slab forming on every-other-day pour cycles. Pump strategy, delivery windows, finishing crews, inspection readiness — on some of the largest single pours in the market.

Large-scale warehouse slab-on-grade flatwork exceeding 1,000,000 SF, executed with the same production discipline as the vertical work.

Elevated deck pourWarehouse flatworkMiami skyline cranesRebar column
London presenting the Riverfront Tower project overview
Featured Case Study

Riverfront Tower.

42 Stories450,000 SFPost-Tension SlabsHigh-Performance Concrete

Full concrete package coordination: mat foundation, post-tension elevated decks, shear-wall core, columns, and high-strength mixes. Sequenced for an every-other-day deck cycle with dedicated pump strategy and inspection windows built into the look-ahead.

Selected Projects

Concrete work by the numbers.

Selected Estimating Work

Bids built from crew data — not databases.

Estimates for concrete scopes from $500K to $5M+ across Western PA, tracked against real production rates in CY, SF, and LF per day.

Western PA Commercial Concrete Pricing Index

A multi-tab pricing index and live quick-estimator for Pittsburgh and Western PA concrete work — foundations, slab-on-grade, elevated decks, curbs, sidewalks, and structural components — priced from local labor rates, material availability, and actual production data.

FoundationsSlab-on-GradeElevated DecksCurbs & SidewalksRetaining Walls

PCC Paving Turnkey Estimates

Complete quantity takeoffs and turnkey estimates for heavy PCC paving — including truck-apron paving, dolly-pad placements, and mainline concrete pavement. Priced end-to-end from mobilization through jointing and cure.

Truck-Apron PavingDolly-Pad PlacementsHeavy PCCTurnkey Takeoff
Blueprints and schedule on tablet
How I Bid

Roughly 1 in 4 pursued bids won.

That hit rate is intentional. Every estimate is built from real crew production, real local conditions, and real logistics — not generic unit prices. When we win, we win cleanly. When we lose, it is not because we tried to bleed on the job.